摘要 本文旨在介绍与井筒完整性有关的预探井及评价井井筒测试作业要求和标准。该测试作业始于钻完设计井深和电测录完裸眼井段,终于井筒压井结束和测试管柱起出。介绍了在过平衡、平衡、欠平衡3种压力条件时的测试作业以及建立不间断压力系统的工作,给出了4个典型图例以说明海洋井测试作业所用井筒屏障的功能、结构组件及其验收标准,并在附录中给出了就地地层、测试管柱作为井筒屏障及其验收要求。明确了测试作业时的井控程序及在井控条件下的钻井作业。在井筒完整性标准基础上,对测试作业的测试压力、测试载荷进行了设计,对测试作业的准备工作和风险防范工作进行了标准化。 The requirements and standards related to well integrity during well testing of exploration wells and appraisal wells were illustrated. Testing operation begins when the well is drilled to the designed depth and the electric logging in the open hole is finished, and ends when the well is killed and the testing string is tripped out. Firstly, the testing operation in three pressure conditions (overbalance-balance-underbalance) and the operation to establish a continuous pressure system were illustrated. Secondly, 4 typical diagrams were provided to describe the function, structural component and acceptance standard of well barrier in testing operation. It was pointed out in the appendix that in-situ formation and testing string are taken as the well barrier and its acceptance requirements were also listed. Thirdly, the well control procedure in the process of testing operation and the drilling activities under the condition of well control were described. Fourthly, the design basis, testing load and design assumption of testing operation were illustrated. And finally, the way to prevent the formation of hydrate in the process of testing operation was introduced briefly.
作者 张绍槐 ZHANG Shaohuai(Xi' an Shiyou University, Xi' an 710065, Shaanxi, China)
机构地区 西安石油大学
出处 《石油钻采工艺》 CAS CSCD 北大核心 2018年第4期405-411,共7页 Oil Drilling & Production Technology
关键词 测试作业 井筒完整性 井筒屏障 电测测井(测录井) 测试管柱 地层完整性 水合物防治 testing operation well integrity well barrier electrical logging (logging) testing string formation integrity hydrate
  • 相关文献

参考文献8

二级参考文献60

共引文献99

同被引文献64

引证文献7

二级引证文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部