基于时序生产模拟的配电网光伏装机容量规划 被引量:1

PV installed capacity planning for power distribution network based on time series production simulation
原文传递
导出
摘要 基于时序生产模拟方法,对含风电与光伏的配电网,建立光伏发电装机容量规划模型,针对不同的弃风弃光率场景对光伏最优装机容量的影响,优化配电网最大光伏接入容量。仿真表明,通过允许一定水平的弃风弃光率,本研究所提规划方法能够在保证风电/光伏合理收益的前提下,最大化接入光伏发电,提高新能源发电利用水平。 Based on time series production simulation,an optimization model was built to optimize PV installed capacity for distribution network with integration of wind and solar power. The optimal installed capacity of the photovoltaic system was given according to the different wind/PV curtailment ratios. Simulations revealed that the proposed planning method guaranteed the reasonable revenue of wind power/PV and maximized the integration of PV generation with a certain level of wind/PV curtailment ratio,which improved utilization level of renewable energy generation.
作者 宋士瞻 王传勇 康文文 张健 闫红华 李鹏 SONG Shizhan;WANG Chuanyong;KANG Wenwen;ZHANG Jian;YAN Honghua;LI Peng(State Grid Zaozhuang Power Supply Company,Zaozhuang 277800,Shandong,China;Shandong Green Power Tech Co.,Ltd.,Jinan 250061,Shandong,China)
出处 《山东大学学报(工学版)》 CAS 北大核心 2018年第5期131-136,共6页 Journal of Shandong University(Engineering Science)
基金 国网山东省电力公司科技资助项目(2017A82)
关键词 可再生能源 弃风弃光 配电网 光伏规划 时序生产模拟 renewable energy wind/PV curtailment distribution network PV planning time series production simulation