摘要 云南大理规划建设光伏发电规划装机容量220万kW,目前光伏装机11.35万kW,占全省36.4%、南网21.9%。为保证云南电网安全稳定运行,最大限度接纳光伏发电。依据《光伏发电站接入电力系统技术规定》、《光伏电站接入电网技术规定》及《云南电网并网光伏电站信息接入省调规范》中对光伏电站有功功率控制的相关要求,2016年9月10-11日,对西村光伏电站开展了站内AGC系统调试和AGC联调测试工作。 Yunnan Dali plans to build a planned installed capacity of 2.2 million kW of photovoltaic power gen-eration. At present, the installed capacity of photovoltaic power generation is 113,500 kW, accounting for 36.4% of the province's total and 21.9% of the southern grid. In order to ensure the safe and stable operation of yunnan power grid, the maximum acceptance of photovoltaic power generation. Photovoltaic power station connected to the power system in accordance with the technical regulations, the provisions on photovoltaic power station connected to the electricity grid technology and the access to the province of yunnan power grid photovoltaic power station informa-tion transfer rules of photovoltaic power station in active power control, the requirements of the relevant September 10-11, 2016, standing on the west village photovoltaic power station was carried out in AGC system debugging and AGC alignment test work.
作者 陈世游 陆海 张少泉 陈晓云 张筱雨 CHEN Shi-you;LU Hai;ZHANG Shao-qun;CHEN Xiao-yun;ZHANG Xiao-yu(Institute of Electric Power Reasearch,Kunming 650217)
出处 《软件》 2018年第10期224-228,共5页 Software
关键词 光伏电站 AGC系统调试 AGC联调测试 Photovoltaic power station AGC system debugging AGC coordinated testingas
  • 相关文献

参考文献6

二级参考文献83

共引文献492

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部