期刊文献+

浅谈BIM技术在桥梁设计中的应用 被引量:2

A Brief Analysis on Application of BIM Technology in Bridge Design
下载PDF
导出
摘要 BIM技术在建筑领域的应用较为成熟,而在桥梁工程领域尚处于发展阶段。鉴于此,以淤泥河桥的BIM应用实践为依托,介绍了桥梁工程三维设计的工作流程及应用成果,展现了基于Bentley平台的桥梁工程三维建模、二维抽图、工程量统计、三维配筋等功能。实践证明,采用Bentley系列软件对桥梁工程进行三维设计是适用的,可推广应用到各类桥梁工程中。 BIM technology has a better application in architectural sector while it is still in a developmental stage in bridge engineering sector. In light of that, based on the practical application of BIM for sludge river bridges, this paper states the workflow and applications of three-dimension design for bridge engineering. It explains some functions of three-dimension modeling, two-dimension plotting, engineering quantity statistics and three-dimension reinforcing bars etc. of bridge engineering based on Bentley platform. The practice has been proved that Bentley series software is applicable for three-dimension design of bridge engineering and can be popularized to various bridge engineering applications.
作者 张云
出处 《城市道桥与防洪》 2018年第11期163-164,185,共3页 Urban Roads Bridges & Flood Control
关键词 桥梁工程 BIM BENTLEY bridge engineering BIM Bentley
  • 相关文献

参考文献4

二级参考文献27

  • 1祝嘉.在城市轨道交通建设项目中应用BIM技术的设想[J].建筑经济,2008,29(S2):375-378. 被引量:37
  • 2过俊.BIM在国内建筑全生命周期的典型应用[J].建筑技艺,2011(1):95-99. 被引量:141
  • 3杨咏漪,刘发明,孙大力.地铁高架桥梁BIM应用研究[J].铁路技术创新,2014(2):79-82. 被引量:2
  • 4王青薇,张建平.基于BIM的工程投资控制研究[J].工业建筑,2011,41(S1):1016-1019. 被引量:32
  • 5Huang T, Kong C W, Guo H L, Baldwin A, Li H. A virtual prototyping system for simulating construction processes [J]. Automation in Construction, 2007, 16( 5 ): 576-585.
  • 6Li H, Huang T, Kong C W, Guo H L, Baldwin A, Chan N, Wong J. Integrating design and construction through virttial prototyping[J]. Automation in Construction, 2008, 17 ( 8): 915-922.
  • 7Li H, GUO H L, Skibniewski M J, Skitmore M. Using the IKEA model and Virtual Prototyping technology to improve construction process management[J]. Construction Management and Economics, 2008, 26 ( 9 ): 991-1000.
  • 8Li H, Guo H L, Skitmore M, Huang T, Chan N, Chan G. Rethinking prefabricated construction management using the VP-based IKEA model in Hong Kong[J]. Construction Management and Economics, 2011, 29 ( 3 ): 233-245.
  • 9Guo H L, Li H, Skitmore M. Life cycle management of construction projects based on Virtual Prototyping technology[J]. Journal of Management in Engineering, ASCE, 2010, 26 (1): 41 47.
  • 10Guo H L, Li H, Chan G, Skitmore M. Using game technologies to improve the safety of construction plant operations[J]. Accident Analysis and Prevention, 2012, 48: 204-213.

共引文献242

同被引文献25

引证文献2

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部