摘要
普速铁路和高铁的业务特性和需求不同,导致GSM-R在组网方案上存在一些差异。结合京哈沈大线GSM-R网络建设工程,提出交叉并线区域的解决方案及相关建议,供类似工程参考。
Because there are different requirements of high-speed railways and conventional railways, their GSM-R networking schemes are different. Combined with GSM-R network construction of Beijing-Harbin, Shengyang-Dalian, and Harbin-Dalian railway lines, the paper puts forward the solution for the section with cross and parallel lines, for providing references for similar projects.
作者
陶岩
Tao Yan(China Railway Shenyang Group Co.,Ltd.,Shenyang 110001,China)
出处
《铁路通信信号工程技术》
2018年第10期37-40,共4页
Railway Signalling & Communication Engineering
关键词
既有线
GSM-R
交叉并线
existing railway lines
GSM-R
cross and parallel lines