600 MW燃煤机组并网前投入脱硝系统的技术实践 被引量:2

Technical practice of denitration system for 600 MW coal-fired unit before grid-connection
下载PDF
导出
摘要 华能铜川照金电厂在未进行设备技术改造的前提下,对以往机组启动过程各阶段参数进行深入分析,通过优化运行操作,将机组并网前脱硝系统入口烟气温度由约265℃调整至约298℃,烟温达到了脱硝催化剂最低连续喷氨温度之上,实现了在机组并网前投入脱硝系统。介绍了主要技术措施及调整前后参数变化,供解决同类问题时参考。 Before the technical reform on equipment in Huaneng Tongchuan Zhaojin Power Plant,in-depth analysis of the parameters at each stage before start-up process were carried out. By optimizing the operation,the flue gas temperature at inlet of denitration system before grid-connection increased from 265 ℃ to298 ℃. The smoke temperature reached the minimum temperature required by continuous spraying ammonia of denitration catalyst. The denitration system was put into practice before the grid-connection. The main technical measures and parameters before and after the adjustment are introduced for reference in solving similar problems.
作者 李海浩 李会军 高明朗 LI Haihao;LI Huijun;GAO Minglang(Huaneng Tongchuan Zhaojin Power Plan)
出处 《华电技术》 CAS 2018年第10期63-64,68,共3页 HUADIAN TECHNOLOGY
关键词 燃煤机组 并网 脱硝系统 技术措施 优化运行 喷氨温度 coal-fired unit grid-connection denitration system technical measures operation optimization temperature of spraying ammonia
  • 相关文献

同被引文献13

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部