摘要
基于建设单位视角,分析工程变更原因及控制,阐述工程变更的审批。结合3种典型案例,分析工程变更发生后,建设单位应采取的处置措施,为建设单位在工程实施过程中有效地控制工程变更提供参考。
From the perspective of construction units,this paper analyzes the causes and control of engineering changes,and expounds the examination and approval of engineering changes. Combined with three typical cases,analyzes the disposal measures to be taken by the construction units after the occurrence of engineering changes,in order to provide references for construction units to effectively control engineering changes in the process of engineering implementation.
作者
吴金东
WU Jindong(Shanghai Lujiazui Finance Trade Zone Development Co.,Ltd,Shanghai 200126,China)
出处
《工程经济》
2018年第10期25-27,共3页
ENGINEERING ECONOMY
关键词
建设单位
工程变更
处置措施
项目管理
construction unit
engineering change
disposal measure
project management