摘要 猴子岩水电站面板堆石坝最大坝高223. 5 m,坝址区河谷狭窄,河床覆盖层深厚,地震烈度高,要求采取有效措施,控制大坝堆石体在面板施工后期的变形量。详细介绍了在工程设计、施工过程中针对堆石体变形提出的控制思路、采取的措施,以及实际的实施效果,可为深窄河谷高面板堆石坝的设计与施工提供参考。 The maximum height of the concrete face rockfill dam (CFRD) of Houziyan Hydropower Station is 223. 5 m.Because the river valley of dam site is narrow, the river bed overburden is deep and the seismic intensity is high in dam area,it is necessary to take effective measures to control the deformation of dam rockfill in the later stage of dam panel construction. The ideas, measures and implementation effects of deformation control against rockfill body during design and construction of dam are summarized, which can provide reference for the design and construction of high CFRD at deep and narrow valley.
作者 朱永国 ZHU Yongguo(Guodian Dadu River Houziyan Hydropower Construction Co., Ltd., Kangding 626005, Sichuan, China)
出处 《水力发电》 北大核心 2018年第11期60-63,共4页 Water Power
关键词 混凝土面板堆石坝 变形 控制措施 猴子岩水电站 concrete face rockfill dam (CFRD) deformation control measures Houziya-n Hydropower Station
  • 相关文献

参考文献2

二级参考文献3

  • 1熊泽斌,杨启贵,张运建.水布垭高面板坝设计[J].人民长江,2007,38(7):19-21. 被引量:10
  • 2猴子岩水电站大坝工程标招标设计报告[R].成都:中国水电顾问集团成都勘测设计研究院,2011.
  • 3猴子岩水电站面板堆石坝接缝止水结构及施工工艺研究[R].北京:中国水利水电科学研究院,2010.