利用有限元软件对武汉汉秀剧场中央表演水池混凝土浇筑施工进行模拟分析,分析3种工况下水池底板和侧墙混凝土浇筑温升变化规律及应力变化规律,依据分析结果和现场条件,确定实际施工方案。选取6个截面进行施工浇筑过程中混凝土温度监测,并与模拟分析结果进行对比。结果表明,施工过程中混凝土温度变化规律与模拟分析一致,模拟分析能够较好地预测温度变化规律,施工方案合理。通过合理分析和监测控制,有效保障了中央表演水池的施工,解决了施工难题。
The concrete pouring construction of the central performance pool of Wuhan Hanxiu Theater was simulated and analyzed by using finite element software. The temperature rising and stress changing laws of the bottom slab and side wall concrete pouring under three working conditions were analyzed. According to the analysis results and the site conditions, the actual construction scheme was determined. Six sections were selected to monitor the temperature of concrete during construction and compared with the simulation results. The results showed that the law of concrete temperature changing during construction was consistent with the simulation analysis, and the simulation analysis could well predict the law of temperature changing, and the construction scheme was reasonable. Through reasonable analysis and monitoring control, the construction of the central performance pool was effectively guaranteed and the construction difficulties were solved.
作者
王冬雁
徐小洋
韦永斌
廖娟
WANG Dongyan;XU Xiaoyang;WEI Yongbin;LIAO Juan(Technical Center of China State Construction Engineering Co.,Beijing 101300,China;China Construction Second Engineering Bureau Ltd.,Shanghai 200135,China)
出处
《施工技术》
CAS
2018年第20期40-43,共4页
Construction Technology
基金
国家重点研发计划(2017YFC0703305)
中建股份科技研发计划资助项目(CSCEC-2018-Z-8)
关键词
水池
混凝土
浇筑
温度控制
分析
监测
施工方案
pools
concrete
pouring
temperature control
analysis
monitoring
construction