期刊文献+

援柬埔寨国家体育场斜拉索桁结构施工过程分析 被引量:6

Construction Process Analysis of Inclined Cable Truss in Kampuchea National Stadium
下载PDF
导出
摘要 援柬埔寨国家体育场罩棚体系是由索桁架、环索、稳定索及斜拉索组成的空间斜拉索桁结构,最大悬挑跨度约65m。为制订一种安全可靠且有效的施工方案,对援柬埔寨国家体育场罩棚的预应力张拉方案进行施工过程分析,确定在施工张拉过程中各跨挠度、钢结构应力和拉索索力的变化规律。采用ANSYS软件对索结构进行施工仿真模拟,分析施工过程中的索力、结构变形和钢结构应力等数据,确定拉索施工方案,保证结构安全性。 Cable truss, hoop cable, stable cable and inclined cable were used in Kampuchea National Stadium, whose maximum cantilevered span is 65 m. In order to find a safe, reliable and effective construction scheme, the construction process of the prestress tension scheme of the canopy of Kampuchea National Stadium was analyzed, and the variation law of deflection, stress of steel structure and cable tension during the construction was determined. Finite element analysis software ANSYS was used in the process of prestress tension construction. In this paper, cable force, deformation and steel structure stress were emulational analyzed in order to ensure the structural safety.
作者 曹江 郭亮亮 郭正兴 罗斌 张春水 张志平 CAO Jiang;GUO Liangliang;GUO Zhengxing;LUO Bin;ZHANG Chunshui;ZHANG Zhiping(China Construction Eighth Engineering Division Co.,Ltd.,Shanghai 200122,China;School of Civil Engineering,Southeast University,Nanjing,Jiangsu 210096,China)
出处 《施工技术》 CAS 2018年第20期58-61,共4页 Construction Technology
关键词 斜拉索 桁架 张拉 施工技术 数值模拟 inclined cables trusses prestressing construction simulation
  • 相关文献

参考文献5

二级参考文献31

  • 1于滨,梁存之,董越,赵洪斌,朱莹,陈茜,张强.深圳宝安体育场环形空间索桁屋盖张拉成型关键技术[J].建筑结构,2011,41(S1):799-803. 被引量:7
  • 2郭正兴,仇俊,罗斌.椭圆形轮辐式预应力索桁结构施工技术[J].施工技术,2005,34(7):1-3. 被引量:5
  • 3石开荣,郭正兴,罗斌.环形辐射状预应力张弦梁钢屋盖张拉优化[J].东南大学学报(自然科学版),2005,35(A01):55-60. 被引量:12
  • 4郭正兴,石开荣,罗斌,田启良,吴聚龙,毕水勇.武汉体育馆索承网壳钢屋盖顶升安装及预应力拉索施工[J].施工技术,2006,35(12):51-53. 被引量:29
  • 5Z X Guo, K R Shi. New development of construction technology for prestressed steel structures [ C ]//Proceedings of the International Symposium on Innovation & Sustainability of Structures in Civil Engineering ( ISISS ' 2005 ). Nanjing: Southeast University Press, 2005 : 1104-1122.
  • 6Yongquan Wang, Zhengxing Guo, Bin Luo, et al. Structural performance analysis of long-span suspen-dome considering construction factors [ C ]//2008 International Pre-Olympic Workshop on Modelling and Simulation, Nanjing, China,2008.
  • 7S Pellegrino. Analysis of prestressed mechanisms[J]. Int. J. Solids Structures, 1990, 26(12): 1329-1350.
  • 8王成瑁,邵敏.有限元法基本原理和数值方法[M].北京:清华大学出版社,1997.
  • 9S Pellegrino and C R Calladine. Matrix analysis of statically and kinematically indeterminate frameworks[J]. Int. J. Solids Structures, 1986, 22(4): 409-428.
  • 10罗斌;郭正兴;仇荣根.索桁架固定千斤顶斜向牵引整体提升的无支架施工方法[P]中国,20111043024882011.