摘要
在火电DCS项目工程执行的过程中,工程项目经理反馈逻辑组态制作及修改工作量大,占用大量的人力资源及时间,给项目资源管理带来很大压力,并且组态质量的好坏直接影响工程项目调试进度及效果。本文通过对磨煤机系统控制模型在工程组态中应用进行介绍,进一步提高组态工作效率,提高方案的标准化率,使控制系统逐步实现模型化提供一种方法。
The executing process of thermal power project(DCS), project manager feedback some problems : heavy workload of logic configuration and modification, need lots of reaources and time, it's also not good for project resource management. Configuration quality directly affect the project debugging progress and results. This paper discusses the coal mill system control model is applied in the project configuration, it presents a method applied to improve the efficiency of the configuration work, and improve the standardized of control model.
出处
《自动化博览》
2018年第10期118-121,共4页
Automation Panorama1
关键词
分散控制系统
(DCS)
控制模型
组态
应用
Distributed control system(DCS)
Control model
Configuration
Application