摘要
凝汽器较普遍存在着泄漏问题,随着凝汽器运行时间的延长,泄漏问题越来越突出。华能伊敏电厂1号机组凝汽器在2017—2018年先后发生三次泄漏,阐述泄露原因,介绍了在机组运行中实施的凝汽器单侧隔离查漏方法,并介绍了预防凝汽器冷却水管泄露的方法。
The condenser leakage problem is quite common. With the extension of the condenser operation time, leakage problem becomes more and more prominent. The condenser of unit 1 of Huaneng Yimin Power Plant experienced three leakage successively in 2017-2018. This paper expounds the reasons for the leakage, introduces the single-side isolated leak inspection method of the condenser in operation of the unit, as well as the method of preventing the leakage of the condenser cooling pipe.
作者
郑金
ZHENG Jin(Huaneng Yimin Power Plant, Hulun Buir, Hulunbuir 021008, China)
出处
《电力与能源》
2018年第5期698-700,707,共4页
Power & Energy
关键词
500MW汽轮机
凝汽器
循环水
隔离查漏
500 MW steam turbine
condenser
circulating water
isolated leak detection