基于BIM技术的预制装配式结构应用研究 被引量:8

Study on application of prefabricated construction based on BIM technology
下载PDF
导出
摘要 针对预制装配式结构图纸量大且质量低、出图难,预制构件预留预埋难,装配施工难的问题,在预制装配式结构项目实施的设计阶段、生产阶段、施工阶段、运维阶段引入BIM技术,保证了预制装配式结构图纸的质量,减少了施工中因图纸错误造成生产构件返工误工的现象,避免了材料的浪费; BIM技术的管线综合优化,精确预留洞口及预埋件的位置和尺寸,提高了预留预埋效率,降低因预留预埋件现场二次开洞引起的施工变更。 In view of such problems of fabricated construction as large quantities, low quality and difficult producing of structural drawings, difficult reserving and pre-embedding of precast units and difficult assembling and construction etc. , the BIM technology is introduced to the design phase, production phase, construction phase, operation and maintenance phase during the prefabricated construction project implementation. By using BIM technology, the quality of the prefabricated construction drawings are ensured, the rework of work pieces due to drawing errors is reduced and the waste of materials is avoided. The comprehensive pipeline optimization of BIM technology can accurately determine the location and size of the reserved holes and the embedded parts, and is beneficial to improve the pre-embedded efficiency and can reduce the construction changes caused by reserving the secondary open holes at the site of reserved embedded parts.
作者 李玉岩 王永洪 武良 Li Yuyan;Wang Yonghong;Wu Liang(Qindao College,Qingdao Technological University,Qingdao 266106,Shandong;School of Civil Engineering,Qingdao Technological University,Qingdao 266033,Shandong;Collaborative Innovation Center of Engineering Construction and Safety in Shandong Blue Economic Zone,Qingdao 266033,Shandong)
出处 《工程建设》 2018年第10期45-49,共5页 Engineering Construction
基金 山东省高等学校科技计划项目(J17KB052) 山东省自然科学基金(ZR2016EEP06)
关键词 BIM技术 预制装配式结构 设计阶段 施工阶段 运维阶段 BIM technology prefabricated assembly construction design phase construction phase operation and maintenance phase
  • 相关文献

参考文献10

二级参考文献43

共引文献435

同被引文献37

引证文献8

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部