摘要 获各琦铜矿充填站扩能后,充填流量增加20%,随着开采深度的增加,充填倍线变小,导致充填管路爆管、堵管事故频发。为此,通过研究充填管路破磨机制,分析充填倍线、管线长度及材质、充填流量等影响因素并优化,结合理论研究及现场充填实际,确定出不同充填倍线下的充填流量、充填管线长度及材质,有效避免了充填管路破磨事故的发生,保障了生产正常运行。 After the energy expansion of the filling station of Huogeqi Copper Mine, the filling flow increased by 20%, and the filling doubling line is decreased with the increasing of mining depth, which leads to frequent accidents of blasting and blocking of filling pipes. Through the study destruction and abrasion mechanism of filling pipe and the analysis of filling doubling line, pipe length and material and filling flow, and combing with the theoretical study and actual filling situation, the filling flow, length and material of filling pipe are determined effectively, the destruction and abrasion accident of filing pipes is avoided, and the safety production of the mine is ensured.
作者 闫海鹏 Yan Haipeng(Xitieshan Branch Company,Western Mining Co.,Ltd)
出处 《现代矿业》 CAS 2018年第10期9-11,14,共4页 Modern Mining
关键词 破磨机制 充填倍线 流量优化 充填管线 Destruction and abrasion mechanism Filling doubling line Flow optimization Fillingpipe
  • 相关文献

参考文献3

二级参考文献12

共引文献35

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部