期刊文献+

220 kV超高压线下某矿山控制爆破方案设计 被引量:4

Design of the Controlled Blasting Scheme of a Mine under 220 kV Ultra-high Pressure Line
下载PDF
导出
摘要 以某凹陷露天铁矿为例,为确保矿山周边500 m范围内220 kV超高压线安全,设计了控制爆破方案并采取了安全防护措施,有效降低了爆破振动、飞石、冲击波等爆破危害对220 kV超高压线、干选厂等生产生活设施的破坏,可供类似工程参考。 Taking a sunken open-pit iron mine as an example,in order to ensure the safety of 220 kV ultra-high voltage line within 500 m around the mine,a controlled blasting scheme and safety protection measures are designed,so to reduce the damage of blasting vibration,flying stones and shock waves to 220 kV ultra-high voltage line and dry concentrator,and to ensure the safety and economy of the mine.Good results have been achieved in safety production and economic benefits,which can provide reference for the similar projects.
作者 葛乐 仪海豹 尤元元 汪禹 关佳佳 Ge Le 1 Yi Haibao 2,3 You Yuanyuan 2,3 Wang Yu 2,3 Guan Jiajia 4(1.Anhui Public Security Department Public Security Police Corps;2.Sinosteel Maanshan Instituteof Mining Research Co.,Ltd.;3.Maanshan Institute of Mining Research Blasting Engineering Co Ltd.;4.Pbubic security Corps,Huainan Public Security Burea)
出处 《现代矿业》 CAS 2018年第10期78-80,共3页 Modern Mining
关键词 220 kV超高压线 控制爆破 爆破振动 爆破冲击波 220 kV high-tension line Controlled blasting Blasting vibration Blasting shock wave
  • 相关文献

参考文献6

二级参考文献29

共引文献14

同被引文献26

引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部