摘要 以660MW超超临界机组主蒸汽管道和再热热段蒸汽管道为研究对象,从管材用量、造价和蒸汽阻力三方面对母管制和双管制管道布置方式进行比较。结果表明:双管制布置方式全面优于母管制布置方式,可为今后类似工程设计提供参考。 Taking the main and hot reheat steam piping of a 660 MW ultra-supercritical unit as the object of study, a comparison was made between the header-lateral layout and double-branch layout on the aspects of tube material consumption, cost of manufacture and steam flow resistance, etc. Results show that the double-branch layout is comprehensively better than the header-lateral one, which therefore may serve as a reference for engineering design of similar projects.
作者 王晓 李广伟 Wang Xiao;Li Guangwei(Shandong Electric Power Engineering Consulting Institute Co.,Ltd.,250013,China;China Power Hua Chuang Electricity Technology Research Shanghai 200086,China)
出处 《发电设备》 2018年第6期442-446,共5页 Power Equipment
关键词 超超临界机组 管道布置 母管制 双管制 蒸汽阻力 ultra-supercritical unit piping layout header-lateral layout double-branch layout steamflow resistance
  • 相关文献

同被引文献22

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部