顶管穿越下凹式立交桥区道路及挡墙变形控制技术 被引量:2

ROAD AND RETAINING WALL DEFORMATION CONTROL TECHNIQUE FOR PIPE JACKING PASSING THROUGH CONCAVE-DOWN OVERPASS AREA
下载PDF
导出
摘要 北京土城北桥区积水治理工程D1400 mm进出水管线施工中,采取顶前预加固,控制顶进速度、出土量、泥水仓压力等技术措施,并根据监测信息及时调整顶管施工,形成动态管理,将变形量控制在允许范围内。 During D1400mm water supply and drainage pipeline construction of Beijing Tucheng Beiqiao District water accumulation treatment project, various technical measures were adopted, such as pre-strengthening before jacking, jacking speed control, earth excavation quantity, slurry chamber pressure, etc. Pipe jacking construction was adjusted timely according to practical monitoring information, to realize dynamic management and to control the deformation within the allowable range.
作者 赵萌 ZHAO Meng(BCEG Civil Engineering Co.,Ltd.,100015,Beijing,China)
出处 《建筑技术》 2018年第11期1205-1207,共3页 Architecture Technology
关键词 顶管施工 道路挡墙 变形控制 pipe jacking construction road retaining wall deformation control
  • 相关文献

参考文献2

二级参考文献10

共引文献3

同被引文献13

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部