摘要
北京土城北桥区积水治理工程D1400 mm进出水管线施工中,采取顶前预加固,控制顶进速度、出土量、泥水仓压力等技术措施,并根据监测信息及时调整顶管施工,形成动态管理,将变形量控制在允许范围内。
During D1400mm water supply and drainage pipeline construction of Beijing Tucheng Beiqiao District water accumulation treatment project, various technical measures were adopted, such as pre-strengthening before jacking, jacking speed control, earth excavation quantity, slurry chamber pressure, etc. Pipe jacking construction was adjusted timely according to practical monitoring information, to realize dynamic management and to control the deformation within the allowable range.
作者
赵萌
ZHAO Meng(BCEG Civil Engineering Co.,Ltd.,100015,Beijing,China)
出处
《建筑技术》
2018年第11期1205-1207,共3页
Architecture Technology
关键词
顶管施工
道路挡墙
变形控制
pipe jacking construction
road retaining wall
deformation control