下凹式桥区雨水泵站暗挖调蓄池施工技术 被引量:1

CONSTRUCTION TECHNIQUE FOR SUBSURFACE EXCAVATED RAINWATER STORAGE TANK OF CONCAVE-DOWN OVERPASS AREA RAINWATER PUMPING STATION
下载PDF
导出
摘要 北京马家堡泵站新建两座暗挖调蓄池,调蓄池竖井多尺寸大且紧邻立交桥,环境风险高。施工时采用复合锚杆桩隔离措施减少对既有建(构)筑物的影响。对既有地下通道采用支柱加固措施,竖井采用倒挂井壁法施工,解决了下凹式桥区暗挖调蓄池施工的技术难点。 The newly built two subsurface excavated rainwater storage tanks in Beijing Majiapu pumping station has many vertical shafts and large dimensions and are adjacent to the overpass, facing high environmenta| risk. Composite anchor pile isolation measure was adopted during construction, to reduce the influence on existing buildings and structures. Column strengthening measure was adopted for existing underground passage and shaft wall upside-down hanging method was adopted for construction of shaft, to solve the technical difficulties in construction of subsurface excavated rainwater storage tank in the concave-down overpass area.
作者 张开坤 ZHANG Kai-kun(BCEG Civil Engineering Co.,Ltd.,100015,Beijing,China)
出处 《建筑技术》 2018年第11期1211-1215,共5页 Architecture Technology
关键词 暗挖雨水调蓄池 立交桥区保护 复合锚杆桩 subsurface excavated rainwater storage tank overpass area protection composite anchor pile
  • 相关文献

参考文献1

共引文献5

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部