期刊文献+

高速铁路CPⅢ高程控制网条件方程的建立 被引量:1

Establishment of condition equations for vertical control network in high-speed railway
原文传递
导出
摘要 针对高速铁路CPⅢ高程控制网条件方程列立时易出现的多样性、冗余性和效率低等问题,提出了一种建立条件方程的方法:基于图论将控制网视为连通图,采用广度优先搜索(BFS)获取生成树、余树和父节点矩阵,根据余树枝节点、联测水准点至根点的路径分别构建闭合环、附合路线,并建立对应的条件方程,通过有限次相加或相减运算,即可得到最简形条件方程。实例分析结果表明:该方法列立的条件方程具有唯一性、最简形,且耗时少,有着较高的实用价值。 Aiming at the shortcomings of the multiformity,redundancy and inefficiency in establishing conditional equations of high-speed railway CPⅢ vertical control network,a novel method is proposed in this paper.Firstly,the control network was regarded as a connected graph,the spanning tree,cotree and predecessor matrix were obtained via BFS;Secondly,all of the closed loops and annexed leveling lines were found according to the paths from the cotree vertexes and known elevation points to the root,and the corresponding condition equations were respectively established;Finally,the simplest form of conditional equations could be obtained by finite addition or subtraction among the equations.A case study was given and the results show that:the method mentioned above could establish the unique and the simplest conditional equations in less time,and has more practical value.
作者 王正帅 胡晋山 王爱生 康建荣 WANG Zhengshuai;HU Jinshan;WANG Aisheng;KANG Jianrong(School of Geography,Geodesy and Planning,Jiangsu Normal University,Xuzhou,Jiangsu 221116,China)
出处 《测绘科学》 CSCD 北大核心 2018年第11期147-151,共5页 Science of Surveying and Mapping
基金 国家自然科学基金项目(41671395 51574132)
关键词 CPⅢ 高程控制网 条件方程 广度优先搜索(BFS) 图论 CPⅢ vertical control network condition equation BFS graph theory
  • 相关文献

参考文献13

二级参考文献47

共引文献235

同被引文献16

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部