期刊文献+

江铜铅锌公司烟化炉余热锅炉改造

The Transformation of Fuming Furnace Waste Heat Boiler in Jiangxi Copper Lead & Zinc Metals Company
下载PDF
导出
摘要 烟化炉—余热锅炉一体化装置,能有效回收吹炼产出的高温烟气余热,但因处理能力提高,引发锅炉热负荷增加,为解决烟化炉余热锅炉顶部烧损的问题,对烟化炉余热锅炉进行了改造。增加了管屏和顶棚水冷壁,以降低烟气温度。改造后,烟化炉余热锅炉运行良好,实现了改造目的。 Fuming furnace-waste heat boiler in an organic whole can effectively recover the residual heat ofhigh-temperature flue gas produced by blowing. However, due to the increased processing capacity, the boiler heatload was increased. In order to solve the problem of burning the top of the fuming furnace waste heat boiler, thefuming furnace waste heat boiler was reformed. Tube screen and water cooled wall have been added to reduce thetemperature of the flue gas. After the transformation, the fuming furnace waste heat boiler runs well and achieves thepurpose of transformation.
作者 郭建荣 荆旭冬 周蓉 Guo Jianrong;Jing Xudong;Zhou Rong(Jiangxi Copper Lead & Zinc Metal Co.,Ltd.,Jiujiang Jiangxi 33250)
出处 《山西冶金》 CAS 2018年第5期89-90,共2页 Shanxi Metallurgy
关键词 烟化炉 余热锅炉 基夫赛特炉 水冷壁 管屏 一体化 fuming furnace waste heat boiler KIVCET furnace water cooled wall tube screen integration
  • 相关文献

参考文献4

二级参考文献5

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部