摘要
文章结合腾冲县人民医院综合业务楼扩建项目一期、二期工程具体情况,阐述了两期工程的隔震结构设计过程中的难点及对应的处理方法,并对优化措施进行了对比分析,建议建立三维模型,进行隔震模拟和碰撞检查,确保隔震功能的实现,以此优化设计,提高工程质量。
Combining with the specifc conditions of the frst and second phases of the extension project of the general business building of Tengchong People's Hospital, the article expounds the difculties and corresponding treatment methods in the design of the seismic isolation structure of the two phases, and makes a comparative analysis of the optimization measures. It is suggested that a three-dimensional model should be established to simulate the seismic isolation and check the collision, so as to ensure the realization of the isolation function, optimize the design and improve the engineering quality.
出处
《中国医院建筑与装备》
2018年第11期66-70,共5页
Chinese Hospital Architecture & Equipment
关键词
隔震结构设计
刚度比
优化设计
局部抗浮
偏心处理
Seismic isolation structural design
Stiffness ratio
Optimization design
Local anti-floating
Eccentric treatment