摘要 为城镇污水厂提标改造提供技术支持,以12家太湖流域城镇污水厂为研究对象,对其出水数据进行统计分析,评估各厂氮磷去除潜力。结果表明:(1)各污水厂在氮磷去除方面的潜力值分别如下,出水TP为0. 30 mg/L,出水NH3-N为1. 00mg/L,出水TN为8. 00 mg/L,但难度偏大;(2)进水BOD5/TN普遍不足,影响生物脱氮;(3)缺氧池中有反硝化除磷作用,磷酸盐去除率最低76%,最高84%;(4)污泥浓度MLSS多数稳定在3 000~4 000 mg/L,ORP在厌氧池约-400 m V、缺氧池约-100m V,在污水厂达到满负荷、水量稳定前提下,精细化管理到位,充分发挥前置预缺氧的反硝化和缺氧池的反硝化除磷潜能,对提高脱氮除磷的效率起到推动作用。 To provide technical support for the upgrading of nmnicipal wastewater treatment plants (WWTPs), the potentials of nitrogen and phosphorus removal for 12 WWTPs in Taihu River Basin were evaluated by analysing their effluent data. The results showed that, ( 1 ) the potential values of nitrogen and phosphorus removal in each WWTPs were as follows : the mininmnl values of effluent TP, NH3-N and TN were 0. 30, 1 mg/L and 8 mg/L, respectively, but 8 mg/L of TN was difficult in maintaining. (2) The influent BOD5/ TN was generally insufficient, which affected biological nitrogen removal. (3) The appearance of denitrifying phosphorus removal are existed in anoxie tank, and the mininmnl removal rate of phosphate was 76% with the maxinmnl of 84%. (4) The sludge concentrations MLSS were mostly stable at 3 000-4 000 mg/L, while ORP value was about -400 mV in anaerobic tank and -100 mV in anoxie tank. Under the condition of full load and stable ilffluent wastewater quantity- with fine management, potential roles of denitrifieation and phosphorus removal in pre-anoxie and anoxie tanks were benefit to removal efficiency of nitrogen and phosphorus.
作者 朱铖 程洁红 赵际沣 顾铭 Zhu Cheng;Cheng Jiehong;Zhao Jifeng;Gu Ming(l.School of Chemical and Environmental Engineering,Jiangsu University of Technology,Changzhou 213001,China;Zhangjiakou Environmental Monitoring Center,Zhangjiakou 075000,China)
出处 《净水技术》 CAS 2018年第11期75-82,119,共9页 Water Purification Technology
基金 江苏省研究生实践创新计划项目(SJCX18-0984 SJCX17-0783) 江苏省太湖水污染治理专项资金科研课题(TH2013303)
关键词 城镇污水处理厂 提标改造 氮磷去除潜力 运行参数 wastewater treatment plants (WWTPs) upgrading and rehabilitation potential of nitrogen and phosphorus removal operation parameters
  • 相关文献

参考文献9

二级参考文献58

  • 1马勇,彭永臻.新型高效反硝化除磷工艺[J].水处理信息报导,2004(3):68-68. 被引量:4
  • 2沈耀良.废水生物脱氮除磷工艺设计和运行中需考虑的几个问题[J].环境科学与技术,1996(2):36-40. 被引量:15
  • 3王建伟,傅敏,周丽.SBR工艺除磷研究进展[J].重庆工商大学学报(自然科学版),2006,23(4):380-383. 被引量:3
  • 4Daniel J Conley, et al.Controlling eutrophication:nitrogen and phosphorus[J].Science,2099,20(1):1014-1015.
  • 5Schindler, Hecky. Eutrophication:more nitrogen data needed[J].Science,2009,8(5):721-722.
  • 6孙永利,等.城镇污水处理厂提标改造中的几个问题[C].全国城镇污水处理厂除磷脱氮及深度处理技术交流大会论文集,2010:7-12.
  • 7郭兴芳.人、碳源投加研究[R].江苏省太湖流域城镇污水处理厂除磷脱氮提标改造技术攻关示范科研项目课题报告,2009.
  • 8郭兴芳,等.低温生物脱氮效果研究[R].江苏省太湖流域城镇污水处理厂除磷脱氮提标改造技术攻关示范科研项目课题报告,2009.
  • 9Tchobanoglous G., Burton F. L., Stensel H. D.. Wastewater Engi- neering: Treatment and Reuse[M], 4th ed.. New York: Metcalf & Eddy Inc., 2003.
  • 10Stephens H. L., Stensel H. D.. Effect of operating conditions on biological phosphorus removal[J]. Water Environmetal Research, 1998,70(3):362-369.

共引文献188

同被引文献7

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部