南昌青山湖污水厂提标改造工程设计方案 被引量:4

Design Scheme for Upgrading and Reconstruction Project of Nanchang Qingshanhu Wastewater Treatment Plant
下载PDF
导出
摘要 南昌青山湖污水厂设计现状规模为50万m3/d,尾水排放执行GB 18918—2002二级标准。文中介绍和分析了青山湖污水处理厂的现状运行情况,由此确定提标至一级B标准的污水、污泥、除臭工艺的设计参数。 Current design capacity of Nanchang Qingshanhu Wastewater Treatment Plant(WWTP) is 500 000 m^3/d, and effluent water quality meets the Level 2 criterion of GB 18918 2002. Current operational condition of Qingshanhu WWTP is introduced and analyzed, based on which designed parameters of wastewater, sludge and deodorization process for the upgrading and reconstruction project of Qingshanhu WWTP to meet the Level 1 Class B criterion are confirmed.
作者 陈昱霖 Chen Yulin(Shanghai Municipal Engineering Design Institute 〈Group〉 Co.,Ltd.,Shanghai 200092,China)
出处 《净水技术》 CAS 2018年第11期83-87,共5页 Water Purification Technology
关键词 污水处理厂 提标改造 多模式AAO 设计方案 wastewater treatment plant(WWTP) upgrading and reconstruction multimode AAO process design scheme
  • 相关文献

参考文献4

二级参考文献7

共引文献38

同被引文献20

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部