期刊文献+

富浆胶结砂砾石防渗保护结构施工工艺及质量控制方法 被引量:2

Research on the Construction Technology and Quality Control Method of Rich-slurry Cemented Sands and Gravels
下载PDF
导出
摘要 针对常规胶结砂砾石耐久性不足的问题,根据"宜材适构"的筑坝理念,在胶结砂砾石中增加胶结材料用量,形成富浆胶结砂砾石作为坝体的防渗保护结构。结合国内第一座胶结砂砾石永久性工程——四川省顺江堰引水枢纽工程,进行了富浆胶结砂砾石防渗保护结构的骨料生产、拌和、运输、仓面作业等施工工艺研究,并分析总结了材料、拌和以及仓面质量控制的指标及措施。研究得到了一套适用于胶结砂砾石坝防渗保护结构的施工工艺和质量控制方法并成功应用,对指导该坝型的建设和推广具有重要意义。 In view of the problem of insufficient durability of conventional cemented sand and gravel( CSG),according to the concept of"structure should adapt to material",the rich-slurry CSG is formed as the protective structure of the dam by increasing the amount of cementitious material.Based on the first permanent CSG dam of Shunjiang Weir Diversion Project in Sichuan Province,this paper studies the production,mixing,transportation and storehouse construction technology of rich-slurry CSG.Meanwhile,the quality control indicators and methods of the materials,mixing and storehouse of rich-slurry CSG are analyzed and summarized.A set of construction technology applicable to the anti-seepage protection structure of CSG dam has been developed and applied successfully,which is of great significance to guiding the construction and promotion of the dam.
作者 纪杰杰 李洪涛 高尚 华天波 姚强 陈新 JI Jie-jie, LI Hong-tao, GAO Shang, HUA Tian-bo, YAO Qiang, CHEN Xin(College of Water Resource and Hydropower, Siehuan University, Chengclu 610065, China)
出处 《中国农村水利水电》 北大核心 2018年第11期155-159,164,共6页 China Rural Water and Hydropower
基金 国家重点研发计划资助项目(2018YFC0406800) 国家自然科学基金资助项目(51809188)
关键词 富浆胶结砂砾石 宜材适构 施工工艺 质量控制 rich-slurry cemented sand and gravel structure adapt to material construction technology quality control
  • 相关文献

参考文献8

二级参考文献58

共引文献188

同被引文献11

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部