构皮滩电厂属于南方电网总调(南网总调)直调电厂,运行值班人员根据南网总调下发的96点计划进行开停机、负荷调整。实时出力偏离发电计划会影响电力系统安全运行,同时产生大量辅助服务考核。阐述了构皮滩实时出力偏离96点计划曲线的原因及解决办法,并在实际工作中取得了成效。
Goupitan power plant belongs to the South China Power Grid's total direct regulation power plant. The operator on duty will start and stop and adjust the load according to the 96 point plan issued by the south network. Real-time output deviation from the generation plan will affect the safe operation of the power system, and produce a large number of ancillary service assessment. This paper expounds the reasons and solutions for the deviation of Goupitan's real-time output from 96-point plan curve, and achieves good results in practical work.
作者
李远军
LI Yuanjun(Guizhou Wujiang Hydropower Development Co., Ltd, Guizhou 550002, China.)
出处
《集成电路应用》
2018年第11期83-85,共3页
Application of IC
基金
贵州电网电力系统科技创新课题项目
关键词
电力系统
南网总调
96点计划
实时出力
power system
South network total regulation
96-point plan
real time output.