摘要
介绍了大连万达商业地产在"总包交钥匙模式"上的变革,提出传统交钥匙模式的具体问题,详细阐述了万达BIM总发包管理模式的特点与其实践方式,并总结万达BIM总发包模式在传统管理模式项目上的优化。
This paper first expounds the transformation of Dalian Wanda commercial realestate in the “turnkey mode of general package” and puts forward the specific problems of the traditional “EPC” turnkey mode. The characteristics and practices of Wanda BIM’s total distribution management mode are described in detail. It also summarizes the optimization of Wanda BIM’s total distribution mode in traditional management mode projects.
作者
李秀文
林柔娜
彭苗
Li Xiuwen;Lin Rouna;Peng Miao(School of Civil Engineering and Architecture,Xiamen University of Technology,Xiamen 361024,China)
出处
《山西建筑》
2018年第33期253-255,共3页
Shanxi Architecture
关键词
工程管理
BIM
施工总承包
BIM总发包
project management
BIM
construction general contracting
BIM total contracting