模块化变电站在南方电网的应用可行性分析 被引量:8

Feasibility Analysis of Modular Substation Application in China Southern Power Grid
下载PDF
导出
摘要 变电站建设多采用传统土建模式,存在效率低、占地大、建站周期长、投资高等缺点,难以满足现阶段南方电网发展需求。模块化变电站是一种崭新的变电站建设模式,具有建设速度快、建设效率高、建设成本低等突出优势。介绍了模块化变电站的特点、应用范围和造价情况,并对模块化变电站在南方电网的应用可行性进行了探讨。 Traditional civil construction modes are usually adopted in substation construction,which have disadvantages including low efficiency,large land occupation,long construction period and high investment and so on and cannot satisfy the development requirements of China Southern Power Grid at current stage.Modular substation is a new substation construction mode which has highlight advantages including rapid construction speed,high construction efficiency and low construction cost and so on.Characteristics,application scope and cost of modular substation are introduced and the feasibility of modular substation application in China Southern Power Grid is discussed.
作者 叶健 孙福鹏 Ye Jian;SUN Fupen(Power Grid Planning Research Center of Guangxi Power Grid Co.,Ltd.,Guangxi Nanning 530023,China;Qingdao Tgood Electric Co.,Ltd.Shandong Qingdao 266101,China)
出处 《广西电力》 2018年第5期48-51,共4页 Guangxi Electric Power
关键词 模块化 变电站建设 电网发展 modularization substation construction power grid development
  • 相关文献

参考文献1

二级参考文献3

共引文献20

同被引文献73

引证文献8

二级引证文献59

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部