泸定水电站枢纽接地网接地电阻超标处理 被引量:2

Countermeasures against Overproof of Ground Resistance of Hub Grounding Grid for Luding Hydropower Station
下载PDF
导出
摘要 泸定水电站建于厚覆盖层上,覆盖层主要由(3)_(-1)亚层的含漂(块)卵(碎)砾石层和(2)_(-1)亚层的漂(块)卵(碎)砾石层组成,其土壤接地电阻率较高,枢纽接地网设计接地电阻应小于0. 50Ω,2014年4月测量的接地电阻0. 71Ω,超过标准。为确保电站人身和设备安全,决定对枢纽接地网进行改造,确保其接地电阻符合设计要求。 The Luding Hydropower Station was built on the thick covering layer which is made up of drifting (block) pebble gravel layer including ③-1 and ②-1 sublayers and has a greater soil ground resistivity. The ground resistance for the hub ground grid is designed at less than 0.50Ω. The ground resistance measured in April 2014 is 0.71Ω, which is above proof. In order to ensure the personal and equipment safety in the hydropower station, a transformation decision of the hub grounding grid is made to guarantee the ground resistance meets the design requirement.
作者 郭振兴 GUO Zhenxing(Sichuan Huadian Luding Hydropower Co,Ltd,Luding 626100,China)
出处 《中国水能及电气化》 2018年第11期43-46,共4页 China Water Power & Electrification
关键词 水电站 接地电阻 超标 处理 hydropower station ground resistance overproof countermeasure
  • 相关文献

同被引文献17

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部