期刊文献+

基于交替方向乘子法的电—气互联系统分布式协同规划 被引量:18

Distributed Co-planning of Electricity and Natural Gas Systems Based on Alternating Direction Method of Multipliers
下载PDF
导出
摘要 逐渐增多的燃气机组和日益发展的电转气技术使得电力、天然气系统的耦合愈加紧密,因而对电力、天然气系统的规划也需要考虑两个系统的耦合作用。目前中国的电力系统、天然气系统分属不同的投资决策主体,两个系统通常只进行部分信息交互。针对这一特点,基于交替方向乘子法构建了电—气互联系统的分布式协同规划算法。首先考虑电力系统和天然气系统的相关运行约束,建立了以燃气机组、电转气为耦合元素的电—气互联系统的集中协同规划模型;其次,采用交替方向乘子法在电力系统源、网协同规划子问题和天然气网络规划子问题的基础上,通过耦合变量的信息传递,构建了两个子问题交替迭代求解的机制。最后以修改的IEEE 39节点电力系统和比利时20节点天然气系统所构成的电—气互联系统为例,说明了所提方法的可行性和有效性。 As the rapid growth of gas-fired generators and the development of power-to-gas (P2G) technology intensify the interdependency between electricity and natural gas system, it is imperative to co-optimize the two systems synergistically. In China, the electricity system and natural gas system belong to different investment and decision makers, which means the two systems can only share little information with the help of an isolated coordinator. To adopt this situation, a distributed co- planning method of integrated electricity and natural gas system is proposed based on the alternating direction method of multipliers (ADMM). Firstly, a collaborative co planning model of integrated electricity and natural gas system coupled by gas fired generators and P2G is proposed. The operation constraints of power system and natural gas system are taken into account to establish the planning model. Secondly, an co-planning subproblem of power system source-network and a planning subproblem of natural gas network are presented via the ADMM theory. With the information transfer of coupling variables, the mechanism of alternating iterative solution for two suhproblems is developed. Finally, the effectiveness and feasibility of the proposed model is verified by an integrated electricity and natural gas system which consists of modified IEEE 39-node power system and Belgium 20-node gas system.
作者 王旭 别朝红 WANG Xu;BIE Zhaohong(State Key Laboratory of Electrical Insulation and Power Equipment,Xi'an Jiaotong University,Xi'an 710049,China;Shaanxi Key Laboratory of Smart Grid,Xi'an Jiaotong University,Xi'an 710049,China;School of Electrical Engineering,Xi'an Jiaotong University,Xi'an 710049,China)
出处 《电力系统自动化》 EI CSCD 北大核心 2018年第22期107-117,共11页 Automation of Electric Power Systems
基金 国家重点研发计划资助项目(2016YFB0901900) 国家自然科学基金重点项目(51637008)~~
关键词 电源规划 电网规划 天然气网络规划 电转气 交替方向乘子法 power source planning power grid planning planning of natural gas 'network power to gas (P2G) alternating direction method of multipliers (ADMM)
  • 相关文献

参考文献9

二级参考文献68

  • 1倪萌,M.K.H.Leung,K.Sumathy.电解水制氢技术进展[J].能源环境保护,2004,18(5):5-9. 被引量:59
  • 2Jing Dong,Changzheng Liu,Zhenhong Lin.Charging infrastructure planning for promoting battery electric vehicles: An activity-based approach using multiday travel data[J].Transportation Research Part C.2014
  • 3Ashoke Kumar Basu,S.P. Chowdhury,S. Chowdhury,S. Paul.Microgrids: Energy management by strategic deployment of DERs—A comprehensive survey[J].Renewable and Sustainable Energy Reviews.2011(9)
  • 4Yao Liu,Peng Ning,Michael K. Reiter.False data injection attacks against state estimation in electric power grids[J].ACM Transactions on Information and System Security (TISSEC).2011(1)
  • 5Zhang L,Cheng H,Zhang S,et al.A novel point estimate method for probabilistic power flow considering correlated nodal power. IEEE PES General Meeting|Conference&Exposition; . 2014
  • 6Su,Chun-Lien.Probabilistic load-flow computation using point estimate method. IEEE Transactions on Power Systems . 2005
  • 7Geidl, Martin,Andersson, G?ran.Optimal power flow of multiple energy carriers. IEEE Transactions on Power Systems . 2007
  • 8Krause, T.,Andersson, G.,Fro?hlich, K.,Vaccaro, A.Multiple-Energy Carriers: Modeling of Production, Delivery, and Consumption. Proceedings of Tricomm . 2011
  • 9张义斌.天然气—电力混合系统分析方法研究[D].中国电力科学研究院2005
  • 10刘振亚.全球能源互联网[M]. 中国电力出版社, 2015

共引文献1140

同被引文献272

引证文献18

二级引证文献189

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部