期刊文献+

大跨度连续梁支架现浇施工控制技术 被引量:4

Large Span Continuous Beam Bridge Support Cast-in-Place Scaffold Construction Control Technology
下载PDF
导出
摘要 本文从连续梁桥支架现浇施工的控制因素、不同桥梁的施工控制与质量控制等方面开展了混凝土浇筑桥梁施工技术的研究,提出了混凝土桥梁质量的防治措施与控制方法;利用自适应控制系统不断地修正设计参数,支架标高、支架结构稳定性,反算初始计算模型所选用的参数是否合理,对路桥连续梁支架现浇混凝土浇筑具有一定的指导作用。 From the continuous beam bridge support cast-in-place scaffold construction control factor and different bridge construction and quality control, it is conducted the research of pouring of concrete bridge construction technology and put forward the prevention measures and control methods of concrete bridge quality. Through the identification of the health system or parameter estimation, constantly correcting pa- rameters, the design output and the actual output match, the actual problem is controlled, which has a cer- tain instruction function to the highway bridge continual boom support cast-in-place concrete construction.
作者 刘佰国 Liu Baiguo
出处 《辽宁省交通高等专科学校学报》 2018年第5期6-9,共4页 Journal of Liaoning Provincial College of Communications
关键词 大跨度连续梁 现浇支架 施工技术 参数修正 large span continuous beam cast-in-place scaffold construction technology parametercorrection
  • 相关文献

参考文献1

二级参考文献3

共引文献23

同被引文献20

引证文献4

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部