苏洼龙水电站枢纽总体布置 被引量:1

General Layout for Suwalong Hydropower Project
下载PDF
导出
摘要 苏洼龙水电站是金沙江上游以发电为主要任务的大型水电工程。坝址河床覆盖层深厚,地震烈度高,社会环境复杂。在枢纽布置格局比选中,根据坝址的地形地质条件,分析了工程环境影响、工程安全,采用泄洪建筑物和引水发电建筑物两岸分置的枢纽布置格局。 Suwalong hydropower station is a large-sized hydropower project in upper reach of the Jinsha River. Its main purpose is power generation. The dam site overburden is very thick,the earthquake intensity is high and the social environment is complex. In comparison and selection of project layouts,project environment impacts and project safety are analyzed based on topographical and geological conditions in dam site.Therefore,flood discharge structures and headrace and power generation structures are located in both banks respectively.
出处 《四川水力发电》 2018年第6期82-86,共5页 Sichuan Hydropower
关键词 地质条件 布置特点 布置原则 坝型选择 布置方案 geological condition arrangement characteristics arrangement principles dam type selection layout scheme
  • 相关文献

同被引文献2

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部