摘要
以徐州城市快速轨道交通1号线一期工程振兴路站基坑为例,对浇筑施工前车站基坑底板进行超前地质探测,并结合地质勘探资料及钻孔取芯对探测不良地质区域进行检测,结果表明:钻探验证结果与超前地质探测报告一致,证明超前地质探测合理可行性,为类似工程提供一定的参考。
Based on the foundation support engineering background in Xuzhou urban rapid rail transit line 1 the first phase of Zhenxing Road station, carry out advanced geological survey of station foundation pit before construction, combining with geological exploration data and drilling core testing to detect bad geological area, the results show that the drilling verification results are consistent with advance geological exploration and proved advance geological exploration is reasonable and provide some reference for similar projects.
作者
时林坡
Shi Linpo(Xuzhou Rail Transit Engineering Quality and Safety Supervision Station,Xuzhou 221000,China)
出处
《山西建筑》
2018年第34期65-66,共2页
Shanxi Architecture
关键词
基坑工程
超前地质预报
钻孔验证
foundation support engineering
advance geology prediction
drilling verification