期刊文献+

高速铁路初始晚点致因-影响列车数分布模型 被引量:7

Cause-based Distribution Models of Affected Trains Account for Primary Delay in High-Speed Rail
下载PDF
导出
摘要 为了研究高速铁路列车晚点严重程度,基于统计建模方法建立了高速铁路列车初始晚点不同致因情况下影响列车数的分布模型.首先基于中国铁路广州局集团有限公司的高速铁路列车运行实绩,以2014年至2015年高速列车初始晚点影响列车数为建模数据,比选了5类备选模型对初始晚点影响列车数分布曲线的拟合优度;其次运用R语言估计了模型参数并建立了初始晚点致因-影响列车数分布的逆模型;最后对模型可行性进行了卡方检验,并运用2016年高速列车运行实绩数据进行Kolmogorov-Smirnov双样本检验.研究结果表明:每类致因的逆模型精度都能够通过0.05的显著性水平检验,所建立的分布模型与校验数据是同分布,模型预测结果对初始晚点原因的实际影响列车数匹配度在97%以上. To measure the severity of high-speed train delays, the distributions models of the affected trains,owing to different cause-based primary delays, were established using statistical modeling. First, the trainoperation records during 2014 and 2015 obtained from China Railway Guangzhou Group Co. Ltd. wereconsidered to train the models, and the goodness of fit of the five candidate models was compared. Subsequently,the inverse regression model was used to model the distributions of the cause-based affected trains, and theparameters of the models were estimated using the R-program. Finally, the chi-square test was performed, andsubsequently, the Kolmogorov-Smimov double sample tests with respect to the models were employed based onthe testing data of 2016. The test results indicate that all the cause-based models can pass the accuracy test underthe significance level of 0.05, and the established models are identically distributed according to the testing data.The tests also indicate that the matching degree between the prediction results and the observations owing to thedelay causes can be higher than 97%.
作者 文超 李忠灿 黄平 汤轶雄 蒋朝哲 高磊 WEN Chao;LI Zhongcan;HUANG Ping;TANG Yixiong;JIANG Chaozhe;GA(National United Engineering Laboratory of Integrated and Intelligent Transportation,Southwest Jiaotong University,Chengdu 610031,China;School of Transportation & Logistics,Southwest Jiaotong University,Chengdu 610031,China;Railway Research Center,University of Waterloo,Waterloo,N2L3G1,Canada;Dispatching Department,China Railway Corporation,Beijing 100844,China)
出处 《西南交通大学学报》 EI CSCD 北大核心 2018年第6期1261-1269,共9页 Journal of Southwest Jiaotong University
基金 国家自然科学基金资助项目(71871188 61503311) 四川省科技厅应用基础研究项目(2018JY0567)
关键词 高速铁路 列车运行实绩 初始晚点 影响列车数 逆模型 high-speed rail train operation data primary delay number of influenced trains inverse model
  • 相关文献

参考文献6

二级参考文献35

共引文献88

同被引文献41

引证文献7

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部