摘要
西藏天然林资源保护工程二期从2010年开始实施,取得了一定的成效,但同时也存在一些问题。阐述工程建设现状和存在的问题,提出相应对策,以期为工程高质量完成提供参考依据。
The second phase of Tibet's natural forest resources protection project has been implemented since 2010 and has achieved certain results, but at the same time there are also some problems. This paper explained the status quo of engineering construction and countermeasures, in order to provide a reference basis existing problems, for the high - quality and put forward corresponding completion of the project.
作者
冯强
肖前辉
贺鹏
李锐
FENG Qiang;XIAO Qianhui;HE Peng;LI Rui(Central South Forest Inventory and Planning Institute of State Forestry Administration,Changsha 410014,Hunan,China)
出处
《中南林业调查规划》
2018年第3期14-16,50,共4页
Central South Forest Inventory and Planning
关键词
西藏
天然林
保护
对策
natural forests
protect
countermeasure
Tibet