本文以野川煤矿通风系统运行情况为研究对象,选择使用精密气压计逐点测定法对该矿通风系统进行全面测定,分析得出该矿进风段、用风段及回风段的比例为:28.54∶34.46∶49,相对于科学比例有着较大的差距,该矿结合实际情况,采取了对应的优化控制策略,取得了较好的优化效果。
Based on ventilation system operation in Yeehuan Mine, precision barometric point - by - point method was adopted to measure the mine ventilating system, the proportion of inlet, outlet and return air sections was settled as 28.54 : 34.46 : 49, with a large difference to the reasonable proportion, the corresponding measures were given to get good effect.
作者
张建斌
Zhang Jianbin(Yechuan Mining Industry Corporation Ltd.,Shanxi Coal Transportation Ltd.,Gaoping 048400,China)
出处
《煤炭与化工》
CAS
2018年第10期115-117,共3页
Coal and Chemical Industry
关键词
矿井通风
系统阻力
测定
控制
mine ventilation
system resistance
measurement
control