引汉济渭秦岭隧洞(越岭段)施工期间污水处理技术研究

Study on Wastewater Treatment Technology during Construction of Qinling Tunnel(Yueling Section) of Hanjiang-to-Weihe River Project
下载PDF
导出
摘要 隧道施工期间常产生大量涌水,当混杂油污和施工废水再受到车辆搅动后,形成浑浊度很高的污水,直接排出对周边环境影响较大。总结引汉济渭秦岭隧洞出口项目施工期间污水处理的成功经验,为其他项目隧道施工期间污水处理解决方案提供参考借鉴。 During the construction of the tunnel, a large amount of water was often gushed out. When the mutiple-oil and the construction waste water were mixed by the vehicle, it formed a high turbidity sewage and then directly discharged, which has a great influence on the surrounding environment. The article summarizes the successful experience of sewage treatment during the eonstruetion of the Qinling Tunnel Exit Project, and provide reference for waste water treament solutions during tunnel construction in other projects.
作者 房佳亮 Fang Jialiang(The 2nd Engineering Co.,Lt,dChina Railway 17th Bureau Group Xi'an 710043,Shaanxi)
出处 《陕西水利》 2018年第6期102-104,109,共4页 Shaanxi Water Resources
关键词 引汉济渭 隧道 施工期 污水处理 Hangjiang-to-Weihe River project the tunnel the construction period and sewage treatment
  • 相关文献

参考文献3

二级参考文献2

共引文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部