1Ueno H,Matsunaga S,Kaiuchi K K,et al. Operational Results for High Pulverized Coal Injection Rate at Kimitsu No. 3 Blast Furnace[J]. Ironmaking Conference Proceeding, 1995,54 (2),29-36.
2Kimura K,Kishimoto S,Sakai A,et al. Challenge to the Highest PC Rate Operating at Fukuyama No. 4 BF[J]. La Revue De Metallurgie-CIT, 1996, (4): 65-71.