摘要
分析了南昌绿地国际会展中心钢桁架内供回水管线方案的优化与实施,通过对设计方案的合理优化和施工方案的比选,有效保证了供回水管线的施工质量,提高了工程施工效率和管线高空作业时的安全性。
This paper analyzes the optimization and implementation of the backwater pipeline in the steel truss of Nanchang Greenland International Convention and Exhibition Center. Through reasonable optimization of design scheme and comparison of construction scheme,the construction quality of water supply and return pipeline is effectively guaranteed, and the construction efficiency and safety of pipeline operation at high altitude are effectively improved.
作者
李国灵
LI Guo-ling(Shanghai Construction Group 2nd Construction Co.Ltd.,Shanghai 200080,China)
出处
《工程建设与设计》
2018年第22期86-87,共2页
Construction & Design for Engineering
关键词
综合管线
BIM模型三维深化
方案优化
integrated pipeline
three-dimensional deepening of BIM model
programme optimization