陡峻峭壁位置隧道出洞施工技术

Construction Technology of Tunnel Exit in Steep Cliff Location
下载PDF
导出
摘要 主要对复杂环境下的陡峻峭壁位置隧道出洞施工进行总结。针对围岩较好情况,出洞段采用"上下台阶+分次爆破,台阶爆破为先下后上,逐层推进"的技术,贯彻了"早进洞、晚出洞""零开挖"的理念,保证了隧道施工的安全、经济、合理。 This article mainly summarizes the construction of the tunnel exit in steep cliff location in complex environment. The exit section of the tunnel adopts the technology of "upper and lower steps + staged blasting, bench blasting is first down, then up, progressively advancing",which implements the concept of "early entry, late exit" and "zero excavation" and ensures the safety, economy and rationality of tunnel construction.
作者 谭利华 李东坡 秦立鹏 TAN Li-hua;LI Dong-po;QIN Li-peng(The Third Engineering Co.Ltd.ofthe First Highway Engineering Bureau,Beijing 101102,China)
出处 《工程建设与设计》 2018年第22期144-145,共2页 Construction & Design for Engineering
关键词 陡峻峭壁 隧道出洞段 上下台阶 分次爆破 steep cliff exit section of the tunnel up and down stairs staged blasting
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部