期刊文献+

恒运电厂5号机抽汽供热改造 被引量:3

Modification of unit 5 steam turbine to extracting and supplying heat unit in Hengyun Power Plant
下载PDF
导出
摘要 介绍将高压单缸凝汽式汽轮机改造为抽汽供热式机组的设计思路及施工改造过程。对改造中出现的新问题进行了分析并提出解决办法。改造后 ,机组抽气直接供给热网 。 The device thoughts and modification progress that modified one cylinder with high pressure,condensing steam turbine to a extraction and supplying heater ones are introduced. New problems during this modification are analyzed and the ways to solve them are presented. As a matter of fact , the steam turbine is successfully modified to be an extracting and heat unit which can supply heat directly to network with a high social and economic efficiency.
作者 胡剑琛
出处 《广东电力》 2002年第4期66-67,75,共3页 Guangdong Electric Power
关键词 恒运电厂 抽汽供热 高压单缸凝汽式汽轮机 N50-8.83/1.40型 技术改造 extraction and supplying heat steam turbine modification non adjustable extraction