摘要
某核电厂500kV GIS开关站分支母线容量受限,因此对分支母线进行改造。本文从项目施工前、中、后期质量控制的角度,分析各阶段的工作重点。
Due to the branch bus capacity of 500 kV GIS switch station in a nuclear power plant is limited, the branch bus was improved. From the angle of quality control in the pre construction, middle and late stages of the project, the key points of each stage was analyzed.
作者
汪运律
刘伟
汪林
赵强
张翔
WANG Yunlv;LIU Wei;WANG Lin;ZHAO Qiang;ZHANG Xiang(China Nuclear Power Operation Management Co.,Ltd.,Haiyan 314300,China)
出处
《电工技术》
2018年第22期110-111,共2页
Electric Engineering