摘要
根据常州大唐金坛燃机配套220kV送出工程金城镇区段地质条件,对采用GF-250履带式反循环钻机施工技术,在成孔方式、成孔时间、泥浆配置、灌注混凝土用量、施工功效、经济成本、施工便捷性等方面进行分析总结,提出了该地质条件下采用履带式反循环钻机施工的改进方案。
According to the geological conditions of Jincheng town, the use of GF250 reverse circulation drilling rig is ana lyzed in the aspects of pore forming mode, pore formation time, mud configuration, concrete dosage, construction efficiency, economic cost and construction convenience. An improvement plan for the construction of caterpillar reverse circulation drilling rig under this geological condition is put forward.
作者
王驰
陈根华
杜国顺
WANG Chi;CHEN Genhua;DU Guoshun(Jiangsu Transmission and Transformation Co.,Ltd.,Jiangsu 210000,China)
出处
《电工技术》
2018年第22期132-134,共3页
Electric Engineering
关键词
反循环
钻机
成孔
泥浆
功效
reverse circulation
drilling rig
pore forming
mud
effect