以实际工程为例,对预应力反压与混凝土预制组合预压法施工技术进行分析,提出了安全施工措施,工程施工后满足了施工要求,节约了材料成本,缩短了施工工期,解决了现场施工难度大、操作难度高、安全系数低的问题。
Taking the actual project as an example, this paper analyzes the construction technology of prestressed reverse pressure combined with precast concrete, and puts forward the safety construction measures. After the construction, the project meets the construction requirements, saves the cost of materials, shortens the construction period, and solves the problems of large construction difficulty, high operation difficulty and low safety coefficient.