文章探讨了公路隧道施阶段中出现的问题,阐述了隧道施工阶段环境破坏原因以及具体的防护措施,提出了洞口施工、边坡处理、仰坡施工处治、隧道施工便道和弃渣场便道等环保问题的处理方式,经过实践,在公路隧道施工阶段中通过采取以上几种环保策略,能有效遏制施工过程对周边环境的影响。
The article discusses the problems occurred in the application stage of highway tunnels,expounds the causes of environmental damage during tunnel construction and the specific protective measures,and proposes environmental protection such as opening construction,slope treatment, construction of slope slope,tunnel construction access road and waste slag yard. Through the practice of the problem,through the implementation of the above several environmental protection strategies in the highway tunnel construction stage,it can effectively curb the impact of the construction process on the surrounding
environment.
作者
廖志华
冯飞
LIAO Zhihua;FENG Fei(Jiangxi Expressway Investment Group Co.,Ltd.Shangrao Management Center,Wannian Jiangxi 335500,China)
出处
《交通节能与环保》
2018年第6期93-95,共3页
Transport Energy Conservation & Environmental Protection
关键词
公路隧道
施工阶段
环保问题
措施
highway tunnel;construction stage;environmental protection problem;measure