摘要
简要分析了某大厦围护桩失败的原因.系统介绍了此后采取的有限放坡、沉井、部分中心岛等施工对策.从而实现了原有工期、支护费用、周围环境三不变的良好效果.
This paper analyses failing reasons for retaining piles of foundation pit, introduces some construction counter measare such as limited slope,open caissons and partial certre island in foundation pit excavation, which achieves good results.
出处
《连云港化工高等专科学校学报》
1999年第1期29-31,共3页
Journal of Lianyungang College of Chemical Technology
关键词
围护桩
基坑开挖
施工对策
retaining piles
foundation
pit excavation constructioncountermeasure