摘要
洛阳石化总厂化纤厂精对苯二甲酸 (PTA)装置连续污水冷却器BE 15 0 1A/B开车以来频繁失效 ,通过分析失效原因并采取了相应的对策 ,使BE 15 0
The continuous waste water cooler BE 1501A/B of PTA unit for Luoyang petrochemical complex chemical fibre plant failed often since put into operation.By means of failure analysis,the correponding countermeasure was adopted.So that,the failure number of times and frequency for BE 1501A/B greatly was droped down.
出处
《石油化工设备技术》
CAS
2002年第5期49-50,共2页
Petrochemical Equipment Technology