期刊文献+

BIM对绿色建筑工程项目管理影响机理的研究 被引量:1

The Research on the Influence Mechanism of BIM on Green Building Project Management
下载PDF
导出
摘要 绿色建筑是近年来新兴的一个建设工程项目。不同于传统项目开发,具有特殊性和复杂性。我国开发商受到传统理念的限制,在绿色建筑工程项目开发过程中存在着各种问题。通过对绿色建筑工程项目的开发建设进行全面的分析,探讨了BIM技术的影响机理,得出了在绿色建筑项目决策过程中,实施BIM技术能够有效地进行成本控制。 In recent years,green building is a new construction project.It is different from the traditional project development,with particularity and complexity.China's developers are restricted by the traditional concept.In the green building project development process there are a variety of problems.This paper analyzes the development and construction of green building project,discusses the related problems of BIM technology influence mechanism,and puts forward that the implementation of BIM technology can effectively control the cost in the green building project decision-making process.
作者 杜昱霏
出处 《长春工程学院学报(自然科学版)》 2017年第3期38-40,75,共4页 Journal of Changchun Institute of Technology:Natural Sciences Edition
关键词 BIM 绿色建筑 工程项目 BIM green construction project
  • 相关文献

参考文献1

二级参考文献9

  • 1张建平,曹铭,张洋.基于IFC标准和工程信息模型的建筑施工4D管理系统[J].工程力学,2005,22(S1):220-227. 被引量:108
  • 2Kyuman Cho,Taehoon Hong,Changtaek Hyun. Integratedschedule and cost model for repetitive construction process [ J ].Journal of Management in Engineering. 2010 ( 26) : 78 -88.
  • 3Emad Elbeltagi,Mahmoud Dawood. Integrated visualized timecontrol system for repetitive construction projects [ J ].Automation in Construction, 2011 (20) : 940 - 953.
  • 4王爱娟.基于BIM的建设项目进度风险分析模型研究[D].哈尔滨:哈尔滨工业大学,2012.
  • 5S Bilal. Building information modeling framework : a research anddelivery foundation for industry stakeholders [ J] . Automationin Construction, 2009 (18) : 357 -375.
  • 6Tauscher, Mikulakova, Beucke, etal. Automated generation ofconstruction schedules based on the IFC object model [ J ].Computing in Civil Engineering, 2009 (6): 666 -674.
  • 7J Tulke, J Hanff. 4D construction sequence planning - newprocess and data model [ C ] . Weimar: CIB - W78 24thInternational Conference on Information Technology inConstruction, 2007 : 53 -58.
  • 8陈谦,齐健,张伟.4D信息模型对施工过程的影响分析[J].山西建筑,2010,36(15):202-204. 被引量:11
  • 9桑培东,李军,刘学峰,唐振三.基于BIM的建设项目成本动态监控可行性研究[J].价值工程,2013,32(6):49-50. 被引量:16

共引文献58

同被引文献2

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部