期刊文献+

多产品批处理过程调度的MILP建模 被引量:1

A New Mixed Integer Linear Programming(MILP) Model for Multiproduct Batch Plant Scheduling
下载PDF
导出
摘要 基于时间间隙的概念和连续时间描述 ,将设备、产品分配给时间间隙分别表达为两类 0 - 1变量 .采用一个时间轴 ,建立了具有并行生产线的单阶段多产品批处理过程的调度数学模型 .模型表达为一个混合整数规划 ( Mixed Integer Linear Programming,MILP)问题 .相对于已有的基于时间间隙描述的调度模型 ,该模型 0 - 1变量少 ,且能处理顺序相关建立时间 .求解采用分支定界法( BAB) .计算表明 ,该模型求解速度快 ,松弛线性规划和 MILP的最优解之差 ( Integrality Gap)小 。 This paper presented a new mixed integer linear programming(MILP) mathematical model for the scheduling of single stage multiproduct batch plant with parallel lines based on the notation of time slot and continuous time representation. The allocation of products and units to time slots is handled through two sets of binary variables respectively, and one time coordinate is used. This model involves less binary variables than any other model based on the notation of time slot, and can accommodate sequence dependent setup time when different products are processed on the same unit. The branch and bound technique was used to solve the model that reveals small integrality gap. The computation shows that the optimal solution can be derived quickly, especially when the scheduling problem involving several identical several batches is considered.
出处 《上海交通大学学报》 EI CAS CSCD 北大核心 2002年第8期1132-1137,共6页 Journal of Shanghai Jiaotong University
基金 国家重点基础研究发展规划 (973 )项目 (G19980 3 0 4)
关键词 MILP建模 短期调度 多产品批处理过程 混合整数线性规划 生产时间 化学工业 数学模型 short term scheduling multiproduct batch plant mixed integer linear programming(MILP) makespan
  • 相关文献

参考文献6

  • 1[1]Sahinidis N V, Grossmann I E. MINLP model for cyclic multiproduct scheduling on continuous parallel lines[J]. Computers and Chemical Engineering,1991,15:85-103.
  • 2[2]Pinto J M, Grossman I E. A continuous time mixed linear programming for short term scheduling of multistage batch plants[J]. Ind Eng Chem Res,1995,34:3037-3051.
  • 3[3]Cerdá J, Henning G P, Grossmann I E. A mixed-integer linear programming model for short-term scheduling of single-stage multiproduct batch plants with parallel lines[J].Ind Eng Chem Res,1997,36:1695-1707.
  • 4[4]Méndez C A, Henning G P, Cerdá J. Optimal scheduling of batch plants satisfying multiple product orders with different due-dates[J]. Computers and Chemical Engineering,2000,24:2223-2245.
  • 5[5]Méndez C A, Cerdá J. Optimal scheduling of a resource-constrained multiproduct batch plant supplying intermediates to nearby end-product facilities[J]. Computers and Chemical Engineering,2000,24:369-376.
  • 6[6]Moon S, Hrymak A N. Scheduling of the batch annealing process-deterministic case[J]. Computers and Chemical Engineering,1999,23:1193-1208.

同被引文献6

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部