摘要
在全煤巷开采系统的集中大功率胶带机与综掘后配套运输机之间增设水平机械煤仓.可以缩短集中大功率胶带机的开机时间,提高掘进作业率.本文提出一种结构简单的分压式水平机械煤仓,并给出其有关参数的计算方法.
In all coal-bed exploitation system, it can save running time of main belt conveyor and raise tunneling efficiency installing a horizontal mechanical coal bin between main belt conveyor and conveyor of fitting in road heading machine. In the paper, the part-presser horizontal mechanical coal bin and analysis method of its vertical presser are introduced.