1McKim R, Hegazy T, Attalla M. Project performance control in reconstruction projects[J]. Journal of Construction Engineering and Management, 2000, 126 (2): 137-141.
2Rwelamila P D, et al. Total systems intervention: An integrated approach to time, cost and quality mawgement[J]. Construction Management and Economics, 1995, 13: 235-241.
3Babu A J G, Suresh N. Project management with time, cost, and quality considerations[ J]. European Journal of Operational Research, 1996, 88 (2): 320-327.
4Do Ba Khang, Yin Mon Myint. Time, cost and quality trade-off in project management: A case study[J]. International Journal of Project Management, 1999, 17(4): 249-256.
5Shih-Wen Hsiao. Fuzzy logic based decision models for product design[J]. International Journal of Industrial Ergonomics, 1998,21: 103-116.
6李来儿.现代管理会计[M].北京:经济管理出版社,1996.
7杨孟义.施工企业的质量成本核算[J].建筑,2000,(3).
8杨南方,尹辉.住宅工程质量通痛防治手册[M].北京:中国建筑工业出版社,1995.
9王济川.建筑工程质量控制与事故分析[M].武汉:中南工业大学出版社,1998.
10Roger Atkinson, Project management. cost, time and quality,two best guesses and a phenomenon, its time to accept other success criteria[J]. Intermational Journal of Project Management,2001, (71) :343 - 350.